This is the mat that's needed for level B2 from the SPIKE Prime curriculum. It features a sumo field with a curved outer line for line following. It also has 3 red and 3 green lines for tasks that need the robot to stop at first and third line.
The size is set in the pdf so you can print it as is.
- #2330
- 01 Nov 2024