Bag 2 - Pull-up Bar - FIRST LEGO League 2020-2021 RePLAY
These are instructions on how to build the:
- Pull-up Bar
You can find more building instructions and tips and tricks about the competition on this page.
- #1080
- 31 Aug 2020
These are instructions on how to build the:
You can find more building instructions and tips and tricks about the competition on this page.
This is the attachment to accomplish Fll 2019 M10 mission with the Dominator robot. You can see how to attach the attachment to the robot in this tutorial.
This is a movement module, that works like real boat paddles! It consists of two paddles, each connected to a large EV3 motor. The module can be connected with other modules to make a robot that moves like a boat!
This is a steering mechanism made to look like a fish tail, so that you can make the coolest fish robot that steers like a fish. It uses a medium motor to move left and right. You can combine it with other modules to make your sea creature robot with a tail!
Building instructions for the container mission models. The models are used in the Automated delivery mission of FLLCasts Off-season Challenge 2019.
We want students to be able to easily find the parts and to put the parts back in the designated compartments.
Files are printed on both sides of 160-gram sheet of paper A3 format.
The sorting sheet is designed to fit in the cover of the box. To gather in the lid, the excess parts of the printed sheet must be cut off the markers on the front of the sheet.
To extend the life of the sheets, you can laminate them either with a "laminate matte" or a simple laminate. The disadvantage of the simple laminate is that there is a lot of gloss. The disadvantage of laminate matte is that it has to be sealed with a clear PVA C-200 adhesive to prevent it from opening over time.
We recommend printing doublesided and turning over the "short edge", like a book. If you decide, you may flip the printed result over the long side. Both options are available at you local print center.
It's the third version of the VEX IQ Easy Bot with rotated Robot Brain and castor wheel.
Building instructions for a VEX IQ attachment for throwing balls with rubber bands.
- you should attach it to the motor, depending on the orientation of the motor
- you should attach it to the motor, depending on the orientation of the motor.
This attachment is accomplishing three missions from the FIRST LEGO League 2023-2024. It is for the Chain Monster Robot. It solve mission 8 - Rolling camera, mission 12 - Virtual reality artist and mission 13 - Craft creator.
A FIRST LEGO League 2023-2024 attachment for the MiniBox Robot.
This attachment is designed to be thrown back to the base, with the lifted model it collected, before the robot returns, so the team can start loading the model to the next attachment, while the robot is still moving. This is done, so that the team loses less time switching attachments in the base, lowering the chance of human error during the competition.
These are 3D Building Instructions for M15 Research Vessel mission model for the FIRST LEGO League 2024-2025 SUBMERGED competition. You can also check out the alternative mission model for Research Vessel for additional building possibilities.
In Latin, "cadere" means "to fall."
This robot is designed to resemble a drop tower carnival ride. It uses large technic gear ring pieces to achieve the ride's high elevation, with the gear ring turned by a large motor. The falling platform includes a removable seat for a LEGO minifigure. A distance sensor detects the presence of the minifigure, ensuring the ride only operates when someone is on it!
In Portuguese, "observador" means "watcher."
This stationary robot has a distance sensor connected to a motor. It is designed to resemble a lighthouse combined with a watchtower.